Friday, June 6, 2008

Proposal Franchise Sample

Plenary Meeting of Ilo MDA



Today Friday June 6, 2008, at the premises of the District Municipality of Pacocha at 4:10 pm met members of the Roundtable Expanded Ilo (MDA), the Vice Minister of Mines: Felipe Isasi Cayo, General Office MINEM Social Management: José Luis Carbajal Briceño, Minister of Coordination of PCM: Juan Manuel Figueroa Quintana, Dispute Prevention Unit of the PCM: Maria del Carmen Castillo Tagle, Control Management Mining OSINERGMIN: Shino Guillermo Jara Chahua Huamaní and Israel, Mayor of the District Algarrbal: Elva Valdivia Davila, Mayor Pacocha District: Arthur Aragon Cornejo Mayor Provincial de Ilo: Jorge Mendoza Perez, Civil Society Representatives: Alejandro Leon Palomino, Maritza Perea Ortega and Walter Delgado Condori, representatives of the Southern Peru: William Torres Pino, Rodolfo Vicetti Valverde, Manuel Sierra Lopez, Dario Oviedo Cesar Calderon and Montes de Oca Diban, Representative of the Ombudsman's Office: Hector Chavez Cuba.

After welcoming remarks from the Deputy Minister, all the participants and the press and deliver the transcript of the previous session proceeded to set the agenda:
1. Audit report on compliance with the PAMA Ilo smelter by OSINERGMIN.
2. Report of the Executive and Technical Committees.
3. Technical Commission Report on the visit to the Bridge treatment plant Stone.
4. Report of the Municipality of Algarrobal on the water system.
5. Report of the MPI and Southern Peru on hiring a consultant to prepare the technical file of a new treatment plant.
were then invited to go to the press and gathering them for the end of it.



began on schedule with the audit report of OSINERGMIN, whose members said they have issued a resolution of 173.75 penalty fine of ITU for various breaches. Indicated that Southern Company has challenged the resolution of fine and is in process, on the other side is being rectify the deficiencies noted.
Regarding Executive and Technical committees of their respective coordinators took the floor to make reports.
The representative of the Ombudsman's Office handed over a CD with the Ombudsman's Report 94, 124 and 125 on sanitation and solid waste.
On the report of the Technical Committee on the visit made on 04 June at the treatment plant in Puente Piedra aimed to know about the treatment technology used. Became known about the operation of the plant by learning about their problems and limitations, and indicate that the design is not comprehensive and are not processed byproducts. Additionally also made visits to the plant wastewater treatment in Ñaña Carapongo and then to the plant's drinking water tartamiento The Atarjea. The coordinator of the Commission made it known that Sedapal technicians have to know about their willingness to support us in finding the best solutions for comprehensive treatment of water resources and sanitation.
The municipality of El Algarrobal reported the water system, for which it sought the views of the Southern who made the studies that concluded in necesisdad the completion of the recruitment and chlorination for drinking water supply.
On hiring the consultant to prepare the technical file for a new treatment plant indicated that once given the technology to use will proceed with the tendering and contracting of the consultant.
After the intervention of all the members reached the following agreements:
1. Southern Peru and MPI conducted a joint work with the financial support of the Company so that the results of air quality monitoring in the city of Ilo obtained at stations of the municipality are posted online at the website of the entity. The Technical Committee will seek the cooperation of the Ombudsman and the Gesta Air Ilo.
2. The Technical Committee will work on the technology and guidelines to consider in the development of plant engineering for wastewater treatment. Similarly SUNASS be consulted to determine the economic impact - social in fixing the water treatment technology, as well as SEDAPAL, among other institutions in order to have a comprehensive project.
3. Studies on water supply and water treatment for the residents of the District of The Algarrobal go to the Executive Committee for evaluation.
4. Hold the next meeting on Friday July 4th, 2008 at 4:00 de la tarde en las instalaciones de la Municipalidad Distrital de Pacocha, teniendo como agenda los informes de las comisiones Técnica y Ejecutiva.
5. Se acordó que las partes continuarán con las negociaciones relativas al mecanismo de participación de Southern en la financiación de los Proyectos, en el ámbito de la Comisión Ejecutiva, dando cuenta que los avances en la próxima sesión de la mesa de diálogo. Southern precisó que este aporte es independiente del aporte voluntario al programa de solidaridad con el Pueblo que fuera suscrito con el Supremo Gobierno.

Luego de firmado el Acta de la Sesión se invitó a la prensa para darles la información sobre los acuerdos y absolver todas las preguntas.

Thursday, June 5, 2008

Hiring In Brampton On

Visit to treatment plant wastewater





On Wednesday June 4, members of the Technical Committee of the MDA of Ilo, visited the water treatment plant (WWTP) of Puente Piedra. We had a presentation by Ing º Zenobio Edgar Villanueva on the plant extended aeration activated sludge. Is an aerated process with recirculation of sludge that accelerate the development of microorganisms to remove contaminants. The sludge produced is separated in a secondary settler.
The Stone Bridge WWTP is an activated sludge process, extended aeration, opimize the SBR system (Sequency Batch Reactor: reactors) where aeration and sedimentation are carried out in one unit, in alternation.
The design of this plant is Danish, was built in 2002 and its volume is 420 l / s, BOD of 250 mg / l (Part of the polluting organic matter is measured in BOD: biochemical oxygen demand, which is the amount of oxygen absorbed by the biological oxidation of biodegradable organic components of a water sample), for a population (2007) of 250,000. Currently running at around 380 to 400 thousand inhabitants.
We have been operating in conflict flashpoints, its operating cost is 3 million soles per year, it is not used cost user fee. This plant requires upgrading as the design parameters are not being met: characterization of the water, land use, legislation that protects and set the parameters.
The primary recipients are farmers who do not pay anything. There
industrial waste textiles and slaughterhouses.
No treatment by-products: treatment of sludge. There is no drying bed digesters.
operating cost to bring the landfill 30 buckets of sludge / day is S /. 89, m3.
composting is not done and there is no market.
The energy index is 0.43 kW/m3.
operating staff is reduced: 4 people and the preventive maintenance of 3. The chlorination step is having problems.
The staff is sick, stomach and throat. Aerators produce odor and pollution.
Is not a laboratory.



next day (05/06/2008), the Civil Society members visited the plant wastewater treatment Carapongo (Nana) whose design flow is 500 l / s. After being treated is deposited in the river Rimac. The system is anaerobic-aerobic. The treatment of drains with anaerobic process is performed in the absence of oxygen. To improve the quality of effluent must be complemented with a process aerobic (use of aerators or diffusers).
The anaerobic system is fully covered to control emissions. You can use USAB reactors or anaerobic lagoons.
We see that the system works well, is the burden of Huaycán Chosica and yet have difficulty in operating costs of sludge management for transfer to the landfill.



We have to thank Eng º Francisco Quezada Neciosup the presentation and attention and suggestions received.

After the coordination carried out by Eng º Quesada could be made to visit the water treatment plant potable Atarjea, where we received the Ing º Raúl Zamudio, after our presentation and explain the reason for our visit, we will gladly showed us the different stages of the process from acquisition to final processing. We also went to the control room which monitors the entire process. A request to invite nuesro for diagnosis and recommendations for the treatment plant at Ilo, told us he would be willing to collaborate.

On behalf of the Technical Committee to thank those who made this trip and the people who graciously welcomed us.

Combat Action Badge How Many Authorized

Puente Piedra WORLD ENVIRONMENT DAY



05 June is World Environment Day. Much it comes every year on the measures that should be taken to reverse the global ecosystem degradation trends primarily by the actions of man. We must transform ourselves into a society to think and decide as a species and not individually.

In recent years, the star on environmental issues has been Climate Change. At least at the media, is the issue that has attracted more dedication and that is growing very rapidly palpable, and their increasingly visible consequences.

Earthquakes, tsunamis, floods, droughts, species extinction, disappearing glaciers, melting icecaps, etc. are rapidly becoming commonplace in the media, but unfortunately almost never interact with their real causes. Not many times you explain, for example, the relationship between floods and droughts, agricultural and forestry policies in the region, or the lack thereof.

Over the past three or four hundred years, humanity has devoted all its efforts to increase the production of goods, in order to satisfy the "alleged needs" of consumers, which in turn would be induced from the same advertising companies producing them.



Production volumes and consumption of goods has been growing at astronomical rates and, as it had to happen at some point overcome the planet's capacity to absorb our wastes, to eat our garbage, our CO2 breathing, our methane, our CFCs (chlorofluorocarbon, chlorofluorocarbon or chlorofluorocarbons) and drink our effluents, our spill, and vomiting of our industries.

The cup was filled and the contents began to overflow, but it seems that the tap was open so long that it is quite difficult to close. The only option we have is to try to all stop the waste, reducing the level of consumption and consume responsibly and stop the avalanche, otherwise we will cover them all, wherever we are.



But while individual consume responsibly is very important, that just is not enough. We must also act in an environmentally responsible as a society. And that change will be far more difficult to carry out the particular, as a society to abandon the culture of consumerism, would mean a paradigm shift, where values \u200b\u200bsuch as solidarity, respect for diversity and love for life, replaced by selfishness individualism and greed. We must transform ourselves into a society to think and decide as a species and not individually. In a society that abandons the current economic model, run by the owners of capital and power and those who only care is to maximize profits, and build a model environmentally sustainable and socially just. In a society that has no reason to celebrate "World Environment Day" to remember that it exists, but is developed in community with him .. Ricardo Natalichio

Source: www.ecoportal.net