According to the issues raised in the House of Ilo MDA Technical Committee meetings in their proposed topics for the officials to visit us:
-Theme SUNASS official: Situational diagnosis for drinking water solution wastewater treatment in the province of Ilo "
-Theme SEDAPAL official:" Exposure of the different technologies to solve the drinking water and wastewater treatment in the province of Ilo.
The agenda is:
- Visit Guided
- Exhibition
- Conclusions and recommendations
The DGGS of MINEM was coordinating with:
Sedapal: Project and Construction Management - Ing Ana Coletti
Sunass: Management Oversight and Control - Mabel Ing
Morillo The 2 managers have agreed to ask them to reach the Project Profile Treatment Plant wastewater Ilo and the executive summary will be sent via
email the information on the draft presented by the Mayor of the MPI (SNIP Code 56001: Construction and implementation of a system of wastewater treatment in the city of Ilo, amount: S /. 23,258,392.10).
was sent the profile of this project that appeared in the doorway of MEF in relation to PIP 56001.
an Executive Summary In addition to the problem of drinking water and wastewater treatment in the province of Ilo :
Approximate population: 70,000 HBTS.
Water comes to the Province of Ilo from two sources: Pasto Grande and Ite. Water supply
: Pasto Grande (250 l / s), Ite (150 l / s). Total water
: 800 m3 / h
drinking water treatment: Pasto Grande (60 l / s), Ite (500 l / s).
Water supply is rationed (Case of Pampa Wireless is 3hrs every three days).
wastewater treatment, was made using the oxidation ponds, which collapsed and all sewage is deposited directly several years at sea without any treatment.
Morillo Mabel Ing Viera, Director of Monitoring and Control (e) Superintendence of Sanitation Services (SUNASS) requested the ILO EPS is present at the meeting and present an assessment of their drinking water systems and sewage.
addition requested that he forward the Descriptive Report of the WWTP project to Southern plans to finance and, if possible, the conditions of the financing. because unfortunately the Profile tab projects SNIP bank has little information (only present the basic data for the purposes of registration of the project to obtain your code snip).
They sent the request and after some dead ends on the date of travel (12 SET 08) and sending emails are managed to make the visit of Eng º Renso Box Garcia of Project Management and Construction of SEDAPAL for Today Wednesday, 17 September 2008.
The venue was Environmental Services Company SPCC.
Met set the agenda for which was coordinated with the MPI to enable the Manager of the ILO EPS will give us the facilities to visit their facilities.
The tour went to the Company EPS-Ilo for submission of diagnosis of the water system and sewer, then treatment plants catacat drinking water (Ite and Pasto Grande) and the Pampa Wireless ( Pasto Grande), the plant wastewater treatment (Media Luna) and pumping stations and reservoirs.
Throughout the tour were the questions that were answered fully. Then
Eng º Renso García Box made the presentation on different types of technologies that has Sedapal in the city of Lima, in addition to the terms of reference of some sanitation projects. Ing º
Box García promised to send us your comments and suggestions. He was given the part of the EPS Ilo, a ring with the diagnosis and projects implemented in performance and those that require funding. Also, the document scanning project activated sludge.
regret that SUNASS officials were unable to come to this working visit.